RFQ Detail for Teflon Hdpe
RFQ Logo

List of Tender/Project Teflon Hdpe

Daftar RFQ : Teflon Hdpe

Time Left -22 hour(s)
Date Posted 08-Jun-2018
Expired Date 20-Jun-2018
Availibility 0
Location
Detail We Are Needing :
  • 1 Unit Teflon 5Mm Thk X 12 Meter X 30 Meter
Notes Kami membutuhkan Teflon 5mm Thk x 12 Meter x 30 Meter. Kebutuhan 1 lembar. Mohon informasikan spesifikasi, harga dan ongkos kirim. Terimakasih
Click Quote
Select a product and determine the price you want to offer
Send Quotation
New Quote List by Category

Hoist Crane

Date Posted : May 17 , 2019  | Expired Date : May 24, 2019  | Quantity Required :

We are needing :

  • 1 Unit hoist crane

Notes : -

Request By : PT XXXXXX
Availibility : 0

Inverter Welder

Date Posted : May 17 , 2019  | Expired Date : May 24, 2019  | Quantity Required :

We are needing :

  • 1 unit Inverter Welder

Notes : -

Request By : PT XXXXXX
Availibility : 0

Crosby Pressure Safety Valve

Date Posted : May 17 , 2019  |  Expired Date : May 22, 2019  | Quantity Required :

We are needing :

  • 2 Unit Crosby Pressure Safety Valve

Notes : -

Request By : CV XXXXXX
Availibility : 0

Hose Protape Pur 330 Maf 250 Mm (10"X20.000Mm)

Date Posted : May 16 , 2019  | Expired Date : May 23, 2019  | Quantity Required :

We are needing :

  • 20 meter Hose Protape pur 330 MAF 250 mm (10

Notes : -

Request By : PT XXXXXX
Availibility : 0

Stone Crusher Shan Bao

Date Posted : May 16 , 2019  | Expired Date : May 31, 2019  | Quantity Required :

We are needing :

  • 1 unit Stone Crusher shan bao

Notes : -

Request By : PT. XXXXXX
Availibility : 0
New Quote List

Wheel Loader 1.8 Cubic

Date Posted : May 17 , 2019  | Time Left : Jun 17, 2019  | Quantity Required :

We are needing :

  • 1 Unit Wheel Loader 1.8 cubic

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Methyl Bromide

Date Posted : May 17 , 2019  | Time Left : May 24, 2019  | Quantity Required :

We are needing :

  • 5 tabung Methyl Bromide

Notes : -

Request By : CV XXXXXX
Availibility : 0

Kebutuhan Project Bintan Island

Date Posted : May 17 , 2019  | Time Left : May 24, 2019  | Quantity Required :

We are needing :

  • 1 listing Kebutuhan Project Bintan Island

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Kapasitor Bank

Date Posted : May 17 , 2019  | Time Left : May 24, 2019  | Quantity Required :

We are needing :

  • 1 Unit kapasitor bank

Notes : -

Request By : PT XXXXXX
Availibility : 0

Kayu Karet

Date Posted : May 17 , 2019  | Time Left : May 24, 2019  | Quantity Required :

We are needing :

  • 1 kubik Kayu Karet

Notes : -

Request By : PT. XXXXXX
Availibility : 0
Find Product and Service with high Quality

TOP SUPPLIER

PT Mega Unggul Tehnik
Verified
Indotrading gold member
4 Year
Response Rate 100%
UD. Langgeng Jaya
Verified
Indotrading gold member
5 Year
Response Rate 100%
Water Technology Solution
Verified
Indotrading gold member
1 Year
Response Rate 100%
UD. Sekop Dua Sriti
Verified
Indotrading gold member
6 Year
Response Rate 100%
Arrow