RFQ Detail for Ceilling Exhaust
RFQ Logo

List of Tender/Project Ceilling Exhaust

Daftar RFQ : Ceilling Exhaust

Time Left -6 hour(s)
Date Posted 13-May-2019
Expired Date 20-May-2019
Availibility 3
Location
Detail We Are Needing :
  • 1 Listing Ceilling Exhaust
Notes buat penawaran
Click Quote
Select a product and determine the price you want to offer
Send Quotation
New Quote List by Category

Transformer Starlite

Date Posted : May 21 , 2019  | Expired Date : May 28, 2019  | Quantity Required :

We are needing :

  • 1 unit Transformer Starlite
  • 1 unit Transformer Morawa

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Ups Merk Sonnenschein

Date Posted : May 20 , 2019  | Expired Date : Jun 10, 2019  | Quantity Required :

We are needing :

  • 100 Unit UPS MERK SONNENSCHEIN

Notes : -

Request By : PT XXXXXX
Availibility : 0

Asus A411uf-Bv171t

Date Posted : May 20 , 2019  | Expired Date : May 27, 2019  | Quantity Required :

We are needing :

  • 2 Unit Laptop ASUS A411UF-BV171T

Notes : -

Request By : PT XXXXXX
Availibility : 0

Hp Pavilion 14-Bp029tx/Bp030tx

Date Posted : May 20 , 2019  | Expired Date : May 27, 2019  | Quantity Required :

We are needing :

  • 2 Unit Laptop HP Pavilion 14-BP029TX/BP030TX

Notes : -

Request By : PT XXXXXX
Availibility : 0

Kabel Utp Cat6 Amp 23 Awg

Date Posted : May 18 , 2019  | Expired Date : May 25, 2019  | Quantity Required :

We are needing :

  • 150 rol Kabel UTP Cat6 AMP 23 AWG

Notes : -

Request By : PT. XXXXXX
Availibility : 0
New Quote List

Shaving Cream

Date Posted : May 22 , 2019  | Time Left : May 29, 2019  | Quantity Required :

We are needing :

  • 5000 Pieces Shaving cream
  • 5000 Pieces Razor hotel
  • 5000 Pieces Shaving cream 5gr

Notes : -

Request By : Budi santoso
Availibility : 0

Flexibel Metal Pipe

Date Posted : May 22 , 2019  | Time Left : May 29, 2019  | Quantity Required :

We are needing :

  • 1 listing Flexibel Metal Pipe

Notes : -

Request By : PT XXXXXX
Availibility : 0

Cooling Tower

Date Posted : May 22 , 2019  | Time Left : May 29, 2019  | Quantity Required :

We are needing :

  • 3 Ton COOLING TOWER

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Perahu Karet Evakuasi Banjir

Date Posted : May 22 , 2019  | Time Left : May 27, 2019  | Quantity Required :

We are needing :

  • 5 Pieces Perahu Karet Evakuasi Banjir

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Distributor Tangki Panel Fiberglass 50 M3 Provinsi Kalimantan Timur

Date Posted : May 22 , 2019  | Time Left : May 27, 2019  | Quantity Required :

We are needing :

  • 20 Unit Distributor TANGKI PANEL FIBERGLASS 50 m3 Provinsi Kalimantan Timur

Notes : -

Request By : PT. XXXXXX
Availibility : 0
Find Product and Service with high Quality

TOP SUPPLIER

PT. Gema Pola Persada
Verified
Indotrading gold member
3 Year
Response Rate 100%
MTG6 Material Thickness Gauge
Elcometer 106 Pull Off Adhesion Tester
Elcometer 7062 MarSurf PS10 Surface Roughness Tester
PT. Wicaksana Mas
Verified
Indotrading gold member
1 Year
Response Rate 100%
Slabs ProRox SL 580
Slabs ProRox SL 560
Slabs ProRox SL 540sa
Supplier Pipa Conduit | Cable Gland Hawke
Verified
Indotrading gold member
2 Year
Response Rate 100%
CABLE GLAND  TMCX8302 CROUSE HINDS
CABLE GLAND TMCX9352  CROUSE HINDS
CABLE GLAND TMCX6206 CROUSE HINDS
Norton Jaya
Verified
Indotrading gold member
2 Year
Response Rate 100%
Burner Kompor Gas Casting Model 3
Burner Kompor Gas Casting Model 2
Burner Kompor Gas Casting Model 1
Arrow