RFQ Detail for Zinc Anode
RFQ Logo

List of Tender/Project Zinc Anode

Daftar RFQ : Zinc Anode

Time Left -6 hour(s)
Date Posted 13-May-2019
Expired Date 18-May-2019
Availibility 1
Location
Detail We Are Needing :
  • 200 Kg Zinc Anode
Notes buat penawaran
Click Quote
Select a product and determine the price you want to offer
Send Quotation
New Quote List by Category

Minyak Kayu Putih Murni Tanpa Campuran Kadar Sineol 56 % Up.

Date Posted : May 21 , 2019  | Expired Date : Jun 21, 2019  | Quantity Required :

We are needing :

  • 100 Kg minyak kayu putih murni tanpa campuran kadar sineol 56 % up.

Notes : -

Request By : CV XXXXXX
Availibility : 0

Resin S 930

Date Posted : May 20 , 2019  | Expired Date : Jun 20, 2019  | Quantity Required :

We are needing :

  • 500 Kg RESIN S 930

Notes : -

Request By : PT XXXXXX
Availibility : 0

Kotak P3k First Aid Kit

Date Posted : May 20 , 2019  | Expired Date : Jun 18, 2019  | Quantity Required :

We are needing :

  • 10 Unit kotak P3K first AID KIT

Notes : -

Request By : CV XXXXXX
Availibility : 0

Tabita Skin Care Ekslusif Dan Serum

Date Posted : May 19 , 2019  | Expired Date : May 26, 2019  | Quantity Required :

We are needing :

  • 10 Pieces tabita skin care ekslusif dan serum

Notes : -

Request By : PT XXXXXX
Availibility : 0

Calcium Oxide Cao

Date Posted : May 19 , 2019  | Expired Date : May 24, 2019  | Quantity Required :

We are needing :

  • 1 Ton Calcium Oxide CaO

Notes : -

Request By : PT XXXXXX
Availibility : 0
New Quote List

Shaving Cream

Date Posted : May 22 , 2019  | Time Left : May 29, 2019  | Quantity Required :

We are needing :

  • 5000 Pieces Shaving cream
  • 5000 Pieces Razor hotel
  • 5000 Pieces Shaving cream 5gr

Notes : -

Request By : Budi santoso
Availibility : 0

Flexibel Metal Pipe

Date Posted : May 22 , 2019  | Time Left : May 29, 2019  | Quantity Required :

We are needing :

  • 1 listing Flexibel Metal Pipe

Notes : -

Request By : PT XXXXXX
Availibility : 0

Cooling Tower

Date Posted : May 22 , 2019  | Time Left : May 29, 2019  | Quantity Required :

We are needing :

  • 3 Ton COOLING TOWER

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Perahu Karet Evakuasi Banjir

Date Posted : May 22 , 2019  | Time Left : May 27, 2019  | Quantity Required :

We are needing :

  • 5 Pieces Perahu Karet Evakuasi Banjir

Notes : -

Request By : PT. XXXXXX
Availibility : 0

Distributor Tangki Panel Fiberglass 50 M3 Provinsi Kalimantan Timur

Date Posted : May 22 , 2019  | Time Left : May 27, 2019  | Quantity Required :

We are needing :

  • 20 Unit Distributor TANGKI PANEL FIBERGLASS 50 m3 Provinsi Kalimantan Timur

Notes : -

Request By : PT. XXXXXX
Availibility : 0
Find Product and Service with high Quality

TOP SUPPLIER

PT. Gema Pola Persada
Verified
Indotrading gold member
3 Year
Response Rate 100%
MTG6 Material Thickness Gauge
Elcometer 106 Pull Off Adhesion Tester
Elcometer 7062 MarSurf PS10 Surface Roughness Tester
PT. Wicaksana Mas
Verified
Indotrading gold member
1 Year
Response Rate 100%
Slabs ProRox SL 580
Slabs ProRox SL 560
Slabs ProRox SL 540sa
Supplier Pipa Conduit | Cable Gland Hawke
Verified
Indotrading gold member
2 Year
Response Rate 100%
CABLE GLAND  TMCX8302 CROUSE HINDS
CABLE GLAND TMCX9352  CROUSE HINDS
CABLE GLAND TMCX6206 CROUSE HINDS
Norton Jaya
Verified
Indotrading gold member
2 Year
Response Rate 100%
Burner Kompor Gas Casting Model 3
Burner Kompor Gas Casting Model 2
Burner Kompor Gas Casting Model 1
Arrow