Sell The stone Broke the hammer (10-20) Mm from Indonesia by PT HASAL LOGAM UTAMA,Cheap Price

The stone Broke the hammer (10-20) Mm

Rp145.000
  • Minimum Order 1 kubik
  • stock212
  • Country Origin Indonesia
  • CategoriesArtifical Stone
  • Last Updated23 May 2015

Product Specification The stone Broke the hammer (10-20) Mm

Specification SPLIT ROCK HAMMER

Our PT. The main Metal Hasal engaged in the mining industry of rocks in the area of Palu, Central Sulawesi, would like to submit a price quote materials FOB (Freight on Board).
As for the size of the material and the price that we offer per meter3 are:

1 Aggregate 1/2 or (10-20) mm IDR 145,000
2 Aggregate 2/3, 3/5, 5/7 IDR 140,000
3 Aggregate 3/8 or (7-10) mm IDR 135,000

> 4 Grey or< 7="" mm               =""  =""   ="" rp.  ="">
5 Aggregate with IDR 140,000
6 Aggregate B Rp.   85,000
7 Sand River Hammer Rp. 110,000
8 Sirtu                                                  Rp.   55,000
KET:
Aggregate A = 2/3: 3/8: Gray = 6: 1: 2
Aggregate B = 3/5-5/7: 2/3: 3/8: Sirtu = 1: 1: 1: 7


K & termsetentuan:
• The capacity of loading (loading) of 1000 m3/day, calculated after the shape and size of the charge agreed upon. When the barge in the morning before 9.00 WITA and agreement forms/size can be achieved before 12.00 midday, then the loading will be done after lunch time on the same day. But if a new deal is reached in the afternoon, then the loading will be done the next day.
• All costs incurred in the process of loading being the responsibility of the seller, except costs incurred due to the rejection/spatial changes and/or material by the buyer and/or Buyer has yet to pay off the liabilities, be the responsibility of the buyer.
• Coordinates jetty PT. The main Metal Hasal: S 00 49,612 ' E 119 48,680 '.
• Billing system, made cash payments of 50% when signing the contract and the remaining 50% after published News Event Measurement before the barge was flight.
• Price CNF (Cost and Freight) can be provided through pa

Price The stone Broke the hammer (10-20) Mm

: Rp145.000
We are stone mining company located in Palu, Central Sulawesi. We have good quality stone and services.
We have markets that spread from Sulawesi, Kalimantan, Papua, Maluku.Our stone has been used for projects such as roads, bridges, buildings / offices, railways, docks etc.
Our descriptions :
Mining Location : Jl.Trans Palu-Donggala Km 11, Watusampu, Ulujadi, Palu.
Topography : hills, elevation 130 m asl., Vegetation bushes
Start of production : Since 2010
IUP-OP : OK
HO Permit : OK
IUP area : 25 Ha, Active Quarry: 4 Ha
Hauling : 600 m
Jetty : Watusampu, Palu. Coordinates: 00 50’ 3”LS 119 48’ 48”BT
Market Destination : Palu, Samarinda, Balikpapan, Melak, Berau, Sangir, Seram, Merauke
Stone crusher : Shanbao 3 units
Prod Capacity : Total= 10.000 – 25.000 m3/month , split 1/2= 10 m3/hours/unit
Excavator bucket : PC200= 6 units (1 rock breaker)
Wheel Loader : WA350= 1 units, LW300F= 1 units
Crane truck : 1 units
Dumptruck : Hino 500= 12 units, 300= 2 units
Genset : 3 units @ 500 kVA
Electric Power : 2 substation @ 1.1 kVA
Manpower : 90 people

We Sell
  • Batu Pecah Split
  • Abu Batu 7 Mm
  • Batu Pecah 1/2

Dapatkan penawaran terbaik untuk
The stone Broke the hammer (10-20) Mm !

Nama
Quantity
Unit
Request Quote
We are an Online Media that consists of Distributors, Resellers, Manufactures, Suppliers, importers and exporters. If you are interested to buy The stone Broke the hammer (10-20) Mm cheap, please contact the Company directly.

If you are a Company who wished to sell your product,
Contact Supplier
HASAL LOGAM UTAMA

Response Rate :
100%
Jl.Trans Palu-Donggala Km 11, Desa Watusampu, Kec.Ulujadi, Palu Palu, Sulawesi Tengah - Indonesia

Other Companies Related to

Gubuk Grafir Prasasti

Verified Supplier
Indotrading gold member
5 Year
Response Rate 100%

PT. Gema Teknik Perkasa

Verified Supplier
Indotrading gold member
4 Year
Response Rate 79%

PT. Dharmala Prima Sakti

Verified Supplier
Indotrading gold member
3 Year
Response Rate 100%
Arrow